Skip to main content
Printed analytics dashboard and reports on a desk, reviewing CerberusMSP client results
Home / Case Studies
Case Studies

Real Results for Real GTA Businesses

See how we cut downtime, tightened security, and simplified IT for businesses across Toronto and the Greater Toronto Area.

Book a Free 15-Min Audit
8+ yrs
Solving IT problems for GTA businesses
24/7
Monitoring behind every engagement
< 15 min
Typical critical response time
Security
First approach on every project
Browse by Industry
Close-up of a CNC milling machine cutting metal in a Brampton precision machining shop
FEATURED · MANUFACTURING

Cutting Epicor Downtime From a Full Day to 11 Minutes

A 10-person precision machining shop was losing entire days to ERP slowdowns during month-end close. Here's how we fixed it for good.

11 min
avg response time
0 hrs
unplanned downtime
Read the case study →
Calculator, pen, and financial paperwork on an insurance broker's desk in Oakville
Cybersecurity

Cutting Response Time From Days to Minutes

9 min Average response time, down from 2-3 days
Read the case study →
Hand pointing at architectural blueprints on a light table in a Markham design studio
Professional Services

Two Years Without a Single Unplanned Outage

2+ yrs Zero unplanned downtime since migration
Read the case study →
Engineer in a safety vest reviewing a civil site plan with a colleague at a desk in Hamilton
Professional Services

Passing Every Compliance Review Since Onboarding

100% Of client compliance reviews passed since onboarding
Read the case study →
Small office team working at a marketing agency in Mississauga
Managed IT

From a 3-Hour Wait to a 12-Minute Fix

3 hrs → 12 min Average helpdesk response time
Read the case study →
Welder working in a metal fabrication shop with bright sparks in Vaughan
Manufacturing

Splitting the Shop Floor From the Office Network

0 hrs Shop-floor downtime since segmentation
Read the case study →
Rows of aluminum cans on a packaging production line at a Cambridge food processing plant
Manufacturing

Passing Their First CFIA IT Review Without a Scramble

100% Documentation ready on first ask
Read the case study →
Hands writing financial notes beside laptops at a Vaughan accounting firm
Cloud

Moving to the Cloud With Zero Downtime During Tax Season

0 hrs Downtime during migration
Read the case study →
Rows of shelving stocked with pallets inside a Hamilton distribution warehouse
Managed IT

Three IT Vendors Down to One

1 team Replacing three separate vendors
Read the case study →
Empty modern boardroom with leather chairs and a laptop at a Markham law firm
Professional Services

Locking Down Client Data Before an Audit

100% Of audit requirements met
Read the case study →

Want Results Like These for Your Business?

Book a free 15-minute audit and we'll flag your biggest IT risk on the call.

Book Your Free 15-Min Audit
Free IT assessment for your business Book Now